DaysUntil.com Logo1
DaysUntil.com Logo4
01:44:34 PM
Latitude: 51.508333
Longitude: -0.125278
Time Zone: America-US/New_York
timeZoneDefault:1
April 2085
delete iconadd icon21562 days until Easter (Western)
G
Sunday April 15, 2085 (4/15/2085)
Notes: 1st Sunday after the Paschal full moon
Length: 1 day
Period: 1 year

Easter (Old English: Ēostre) or Pascha (Greek: Πάσχα, Paskha; Aramaic: פֶּסחאPasḥa; from Hebrew: פֶּסַחPesaḥ)[1] is a Christian feast and holiday celebrating the resurrection of Jesus Christ on the third day after his crucifixion at Calvary as described in the New Testament.[2][3] Easter is preceded by Lent, a forty-day period of fasting, prayer, and penance. The last week of Lent is called Holy Week, and it contains the days of the Easter Triduum, including Maundy Thursday, commemorating Maundy and the Last Supper,[4][5] as well as Good Friday, commemorating the crucifixion and death of Jesus.[6] Easter is followed by a fifty-day period called Eastertide or the Easter Season, ending with Pentecost Sunday. The festival is referred to in English by a variety of different names including Easter Day, Easter Sunday,[7]Resurrection Day and Resurrection Sunday.

Easter is a moveable feast, meaning it is not fixed in relation to the civil calendar. The First Council of Nicaea (325) established the date of Easter as the first Sunday after the full moon (the Paschal Full Moon) following the northern hemisphere's vernal equinox.[8] Ecclesiastically, the equinox is reckoned to be on 21 March (even though the equinox occurs, astronomically speaking, on 20 March in most years), and the "Full Moon" is not necessarily the astronomically correct date. The date of Easter therefore varies between 22 March and 25 April. Eastern Christianity bases its calculations on the Julian calendar whose 21 March corresponds, during the 21st century, to 3 April in the Gregorian calendar, in which the celebration of Easter therefore varies between 4 April and 8 May.

delete iconadd icon21563 days until Easter Monday (Western)
G
Monday April 16, 2085 (4/16/2085)
Method: 1 day after Easter (Western)
Length: 1 day
Period: 1 year
delete iconadd icon21572 days until Sinai Liberation Day
G
Wednesday April 25, 2085 (4/25/2085)
Method: April 25th on Gregorian calendar
Length: 1 day
Period: 1 year
May 2085
delete iconadd icon21578 days until Labour Day
G
Tuesday May 1, 2085 (5/1/2085)
Method: May 1st on Gregorian calendar
Length: 1 day
Period: 1 year
Shawwal 1508
delete iconadd icon21603 days until Eid ul-Fitr
G
Friday May 25, 2085 (5/25/2085) at Sunset Sunset icon ( 4:00 pm)
I
yaum as-sabt Shawwal 1, 1508 (10/1/1508)
Method: Shawwal 1st on Islamic calendar
Length: 1 day
Period: 1 year
July 2085
delete iconadd icon21661 days until Revolution Day
G
Monday July 23, 2085 (7/23/2085)
Method: July 23rd on Gregorian calendar
Length: 1 day
Period: 1 year
August 2085
Dhu al-Hijja 1508
delete iconadd icon21671 days until Eid al-Adha
G
Wednesday August 1, 2085 (8/1/2085) at Sunset Sunset icon ( 3:47 pm)
I
yaum al-hamis Dhu al-Hijja 10, 1508 (12/10/1508)
Method: Dhu al-Hijja 10th on Islamic calendar
Length: 3 days
Period: 1 year
delete iconadd icon21684 days until Flooding of the Nile
G
Wednesday August 15, 2085 (8/15/2085)
Method: August 15th on Gregorian calendar
Length: 14 days
Period: 1 year
Muharram 1509
delete iconadd icon21691 days until Islamic New Year
G
Tuesday August 21, 2085 (8/21/2085) at Sunset Sunset icon ( 3:09 pm)
I
yaum al-arba`a' Muharram 1, 1509 (1/1/1509)
Method: Muharram 1st on Islamic calendar
Length: 1 day
Period: 1 year
October 2085
delete iconadd icon21736 days until Armed Forces Day (Egypt)
G
Saturday October 6, 2085 (10/6/2085)
Method: October 6th on Gregorian calendar
Length: 1 day
Period: 1 year
Rabi I 1509
delete iconadd icon21760 days until Mawlid an-Nabi (Sunni)
G
Tuesday October 30, 2085 (10/30/2085) at Sunset Sunset icon (12:35 pm (day))
I
yaum al-arba`a' Rabi I 12, 1509 (3/12/1509)
Method: Rabi I 12th on Islamic calendar
Length: 1 day
Period: 1 year
January 2086
delete iconadd icon21823 days until New Years Day
G
Tuesday January 1, 2086 (1/1/2086)
Method: January 1st on Gregorian calendar
Length: 1 day
Period: 1 year
December 2085
delete iconadd icon21828 days until Christmas
G
Sunday January 6, 2086 (1/6/2086)
J
Sunday December 24, 2085 (12/24/2085)
Method: December 24th on Julian calendar
Length: 1 day
Period: 1 year

Valid CSS!Valid XHTML 1.0 TransitionalSend suggestions to Dave@DaysUntil.com - Privacy Policy
1