DaysUntil.com Logo1
DaysUntil.com Logo4
00:56:57 PM
Latitude: 51.508333
Longitude: -0.125278
Time Zone: America-US/New_York
timeZoneDefault:1
August 2060
delete iconadd icon12547 days until Assumption of Mary
G
Sunday August 15, 2060 (8/15/2060)
Method: August 15th on Gregorian calendar
Length: 1 day
Period: 1 year

The Assumption of the Blessed Virgin Mary into Heaven, informally known as The Assumption, is an event which according to the belief of Christians of the Roman Catholic Church, Eastern Orthodoxy, Oriental Orthodoxy, and parts of Anglicanism, was the bodily taking up of the Virgin Mary into Heaven at the end of her life.

The Roman Catholic Church teaches as dogma that the Virgin Mary "having completed the course of her earthly life, was assumed body and soul into heavenly glory."[1] This doctrine was dogmatically and infallibly defined by Pope Pius XII on November 1, 1950, in his Apostolic Constitution Munificentissimus Deus.[2] This belief is known as the Dormition of the Theotokos by the Eastern and Oriental Orthodox Churches. In the churches which observe it, the Assumption is a major feast day, commonly celebrated on August 15. In many countries it is a Catholic Holy Day of Obligation.

Bhadrapada 2117
delete iconadd icon12562 days until Ganesh Chaturthi
G
Monday August 30, 2060 (8/30/2060) at Sunrise Sunrise icon ( 1:11 am)
HL
Monday Bhadrapada 4, 2117 (6/4/2117)
Method: Bhadrapada 4th on Hindu Lunar calendar
Length: 10 days
Period: 1 year
October 2060
Asvina 2117
delete iconadd icon12615 days until Diwali
G
Friday October 22, 2060 (10/22/2060) at Sunrise Sunrise icon ( 2:37 am)
HL
Friday Asvina 28, 2117 (7/28/2117)
Method: Asvina 28th on Hindu Lunar calendar
Notes: Begins on the 13th day of the dark half of Asvina and ends on the 2nd day of the bright half of Kartika.
Length: 5 days
Period: 1 year
December 2060
delete iconadd icon12679 days until Christmas
G
Saturday December 25, 2060 (12/25/2060)
Method: December 25th on Gregorian calendar
Length: 1 day
Period: 1 year
January 2061
delete iconadd icon12686 days until New Years Day
G
Saturday January 1, 2061 (1/1/2061)
Method: January 1st on Gregorian calendar
Length: 1 day
Period: 1 year
Primens 正月 year 18, cycle 79
delete iconadd icon12706 days until Chinese New Year
C
Xin-you (雞 Fowl)年, Primens 正月, 1日 (星期五) (79.18.1.1)
G
Friday January 21, 2061 (1/21/2061)
Method: Primens 正月 1st on Chinese calendar
Length: 15 days
Period: 1 year
February 2061
Magha 2117
delete iconadd icon12735 days until Maha Shivaratri
G
Saturday February 19, 2061 (2/19/2061) at Sunrise Sunrise icon ( 3:05 am)
HL
Saturday Magha 29, 2117 (11/29/2117)
Method: Magha 29th on Hindu Lunar calendar
Notes: (14th day of the dark half of Magha)
Length: 1 day
Period: 1 year
Shawwal 1483
delete iconadd icon12737 days until Eid ul-Fitr
G
Sunday February 20, 2061 (2/20/2061) at Sunset Sunset icon ( 1:25 pm)
I
yaum al-ithnayna Shawwal 1, 1483 (10/1/1483)
Method: Shawwal 1st on Islamic calendar
Length: 1 day
Period: 1 year
March 2061
delete iconadd icon12756 days until National Day (Mauritius)
G
Saturday March 12, 2061 (3/12/2061)
Method: March 12th on Gregorian calendar
Length: 1 day
Period: 1 year
Chaitra 2118
delete iconadd icon12766 days until Yugadi
G
Tuesday March 22, 2061 (3/22/2061) at Sunrise Sunrise icon ( 1:57 am)
HL
Tuesday Chaitra 1, 2118 (1/1/2118)
Method: Chaitra 1st on Hindu Lunar calendar
Length: 1 day
Period: 1 year
May 2061
delete iconadd icon12806 days until Labour Day
G
Sunday May 1, 2061 (5/1/2061)
Method: May 1st on Gregorian calendar
Length: 1 day
Period: 1 year

Valid CSS!Valid XHTML 1.0 TransitionalSend suggestions to Dave@DaysUntil.com - Privacy Policy
1